/app/projects/cmp9u9l900003ughmjwsnbv7u/documents
Project Documents
Upload contracts, AIA packets, lien waivers, COIs, certified payroll, safety docs, and closeout files.
Uploaded Files
Compliance Impact
Upload signed contract and proposal
PROJECT_START · Source: Article 15 / Subcontract Documents
Set up AIA G702/G703 pay application
PAY_APP · Source: Article 10 / Article 11
Confirm 10% retainage calculation
PAY_APP · Source: Article 11.1.8.1
Submit pay application by the 25th
PAY_APP · Source: Article 11.1.3
Attach conditional partial lien waiver
LIEN_WAIVER · Source: Article 10
Track daily written progress reports
DAILY_REPORT · Source: Article 4.2.4
Track certified payroll requirement
CERTIFIED_PAYROLL · Source: Article 14.7.1
Check on submittals 2 weeks after submission
SUBMITTAL · Source: 2 week follow-up after submitted checkbox
Corrections needed: revise and resubmit drawings
SUBMITTAL · Source: Submittal correction workflow
Submit drawings / submittals within 1 month of contract date
SUBMITTAL · Source: Contract date + 1 month warning
Insurance Status
Auto Liability - Combined Single Limit
Required: $1,000,000
Commercial General Liability - Each Occurrence
Required: $1,000,000
Commercial General Liability - General Aggregate
Required: $2,000,000
Pollution Liability
Required: $5,000,000
Professional Liability
Required: $5,000,000
Umbrella / Excess Liability - Each Occurrence
Required: $5,000,000
Workers Comp - Each Accident
Required: $1,000,000